Chehalem Cultural Center

 

A community’s vision achieved using adaptive reuse

The Chehalem Cultural Center is a community building directly informed by the people it serves. SEA worked closely with Chehalem Park and Recreation District (CPRD) and the Cultural Association to develop a vision for this 1930s era former elementary school. Our renovation design incorporated both flexible and specialized spaces, ranging in type from a fused glass studio to an art gallery. We also modernized the systems while still maintaining the historic character of the building, preserving its history for generations to come.

 

Client
Chehalem Parks & Recreation District
Chehalem Cultural Center

Location
Newberg, OR

Size
46,000 sf

Year
On-going since 2005

Achievements
Phase I: LEED Silver
Gold Nugget Awards Judges Special Award of Excellence in Renovation Grand Award
Phase I: 2010 IIDA Honor Award

 
 
front of chehalem cultural center, formerly a school house
 

The Chehalem Cultural Center is housed in a brick depression-era elementary school, originally built in 1935 as a Works Progress Administration project. SEA’s adaptive reuse was a balance between preserving the building’s historic charm and modernizing it for contemporary uses. Part of this process included reaching out to over twenty Newberg-based organizations to ensure our design reflected their needs. Allowing the historic building to shine through the new finishes was a priority.

 
 
 

The building character was maintained by leaving existing materials in place where possible and salvaging and repurposing in new ways when not. Reused materials are used to accentuate special points within the renovated building, such as entry alcoves and wood accent screens flanking the main entry and reception window. Wood doors were also salvaged, refinished, and reinstalled in new locations.

 
main lobby with original flooring and reclaimed horizontal wood slatted feature at information desk
 
art room with table, chairs, and paper supplies
computer room
 
 

Through our collaboration with community groups, we knew that this building needed to serve many uses. Phase 1 of this project included specialized spaces for professional sound recording, ceramics, fused glass, creative arts, a computer lab, community rooms, administrative offices, and a new central art gallery.

 

Salvaged fir trim and wall paneling were reused as wall and ceiling treatments.

chehalem cultural center teaching kitchen. kids learning how to make cupcakes

Culinary Enrichment Center

 

Phase IV includes the addition of a Performing Arts Wing. This portion of the building includes a renovated 250-seat theatre, associated support spaces, movement studios, storage, mechanical spaces, and completes the connection to the first floor with a new grand stair, lobby, and gallery leading to the new second floor spaces. The Performing Arts Wing supports the client’s goals to provide equitable access to arts facilities for the community and creates an elevated entertainment venue for audiences.

 
 
 
Ballroom garage door with horizontal reclaimed wood feature
Ballroom garage door from the outside
 
 

Flexibility and multi-use spaces were also project goals. We designed rooms to have open floor plans and be acoustically separated to allow a multitude of uses. Folding divider partitions were installed where possible to accommodate different size groups of users. We unobtrusively integrated a modern MEP system by tucking it within existing walls and ceilings.

 
Ballroom showing wood ceiling and bright lighting
 

Phase 1 of the Chehalem Cultural Center project is LEED Silver certified and incorporated building-wide energy-efficient electrical and mechanical systems. Other sustainable features included natural fiber countertops and ceiling treatments, recycled content ceramic tile, and low-VOC materials and coatings. Original concrete floors were repaired, polished, and stained while existing wood columns and beams were sandblasted and left exposed where possible. Site improvements included water-efficient landscaping and pervious paver parking areas.

 
detail of ballroom ceiling and lighting
 
 
 

Acknowledgements

SEA Team
Alden Kasiewicz
Sid Scott
Jennifer Marsicek
Jesse Graden
Andrew Kraus
Sara Ruzomberka
Trent Jorgenson
Heather Hargesheimer

Project Team
Triplett Wellman Contractors
WRG Design
R&W Eng.
Miller Consulting Eng.
Woodburn Const.
WDY, Inc.
JBK
ABD Eng.
Mayer/Reed
DGS General Const.
DMC

Photography Credits